I ran out of rail and had to order some more. While waiting for the rail to arrive I started some track and turnout weathering.
Showing posts with label turnout. Show all posts
Showing posts with label turnout. Show all posts
Thursday, February 3, 2022
Turnout weathering
Labels:
nersmutsning,
On2,
smutsning,
turnout,
växel,
weathering
Sunday, April 19, 2015
An O Scale Turnout
My modeling efforts have been scarce these days, and not consistent when it comes to scale. My last contribution to the hobby is a turnout in O scale!
How come? Well, it started when I happened to run into Mike Cougill's book Detailing Track. Since I have always been more or less a nerd when it comes to realistically modeled track, this book really got me hooked. I just had to try this for myself! So I decided to build an O scale turnout, using the techniques outlined in Mike's book, and with the hardware details he recommended.
This is my parts list:
Thanks for looking.
| Click to get a closer view. |
This is my parts list:
To use pine for the ties was not a very good idea. The pine is to hard to allow the spikes to be just pushed down. Instead I had to pre-drill every spike hole. Not very funny! Basswood is not readily available here in Sweden., but in retrospect I now know it would have been worth the effort to order it from overseas.
Some more photos:
Labels:
0 scale,
Model railroad,
modelljärnväg,
O scale,
skala 0,
turnout,
växel
Saturday, April 7, 2012
Laying some track
Once the cork had set I proceeded with the Central Valley tie strips. I glued the strips to the cork, using the same glue I earlier used to glue the cork to the foam. The strips have special provisions at the ends so that they easily, and using a little styrene cement, hook together forming longer strips as needed.
I paid special attention to the spots where the strips met the turnouts, making sure they were aligned properly so that the rails protruding from the turnout assemblies would fit on the "tie plates" on the tie strips.
When the tie strips were in place I glued the turnout assemblies to the foam, and bonded the protruding and overlapping rails to the tie strips with CA. Then I put some weights (books) on top of the lot and let it sit overnight.
Today it was some time for some rails. After cutting the rail to the proper length I soldered a piece of feeder wire to the bottom of it, making sure the wire would end up on top the hole I had just made through the cork and foam. I find it easier and safer to just poke a hole with a small screwdriver and widen it with a jewelers file, instead of using a drill. It is difficult to control the drill in the foam, and it produces a lot of dust. Poking and filing is much cleaner.
I bonded the rails to the tie strips using PlioBond contact cement. The tedious part is to apply cement to the strips. To avoid getting cement on the tie plate and spike details I apply it using a tooth pick. To get the cement onto the underside of the rail is much easier, once you get the hang if it. I hold the rail upside down using a pair of pliers and stroke the tip of the cement tube along the rail at a steady pace. You need not press the tube to get the cement out. Once you have got it started it will sort of drag itself out of the tube as you go along. Fascinating!
Here is the result. Last picture with a box-car doing the maiden trip.
I paid special attention to the spots where the strips met the turnouts, making sure they were aligned properly so that the rails protruding from the turnout assemblies would fit on the "tie plates" on the tie strips.
When the tie strips were in place I glued the turnout assemblies to the foam, and bonded the protruding and overlapping rails to the tie strips with CA. Then I put some weights (books) on top of the lot and let it sit overnight.
Today it was some time for some rails. After cutting the rail to the proper length I soldered a piece of feeder wire to the bottom of it, making sure the wire would end up on top the hole I had just made through the cork and foam. I find it easier and safer to just poke a hole with a small screwdriver and widen it with a jewelers file, instead of using a drill. It is difficult to control the drill in the foam, and it produces a lot of dust. Poking and filing is much cleaner.
I bonded the rails to the tie strips using PlioBond contact cement. The tedious part is to apply cement to the strips. To avoid getting cement on the tie plate and spike details I apply it using a tooth pick. To get the cement onto the underside of the rail is much easier, once you get the hang if it. I hold the rail upside down using a pair of pliers and stroke the tip of the cement tube along the rail at a steady pace. You need not press the tube to get the cement out. Once you have got it started it will sort of drag itself out of the tube as you go along. Fascinating!
Subscribe to:
Posts (Atom)


