Friday, January 4, 2013

Ballasting the main


I wanted at least some parts of the layout to become more complete, so I decided to ballast the main line. Part of the decision was also an urge to test the Minitec H0 Phonolith ballast, which I purchased some time ago.

But before ballasting I actually did scenic the narrow stretches of right-of-way along the actual track. So far, on previous layouts, I have always ballasted first and done the scenicing next, so this was a new approach for me. Some people say this yields better results, and besides this is how it is done in real life. I would not say that the difference, as compared to doing it in the opposite order, is very dramatic, but yes, maybe ballasting on top of the surroundings gives slightly better looking end result.

Anyway, I started by adding gravel along the outsides of the sub-road bed, and ground foam and static grass along the layout edge. I also added some vegetation that climbs on the retaining wall. I did all this using the true and proven standard method: apply a layer of white glue; spread the material; wet with alcohol; soak with a water and glue mix. The gravel is actually some N scale ballast (from Minitec). Here is a picture.


  
Next I added ballast. I used Minitec H0 Gleisschotter Phonolith. Gleisschotter is German and simply means track ballast. Phonolith is the kind of rock it emulates. Below is a picture where some of the track has been ballasted and some not.


 
Here is a closer look, where I also tried to add an old cardboard box, so that things would not look that neat.
 


In this last picture I wanted to show that with the CVC tie strips it possible to actually get a gap between the bottom of the rails and the ballast. Something that normally is not possible with flex track. Looks nice I think, but if you don't know the gap is there, you will probably never notice. But since I know...
 

2 comments:

  1. Nice job! Looks very cool. I belive that yo showed how did your weather the track, but I can't find it....

    ReplyDelete
    Replies
    1. Thanks Luis! I did describe the track weathering, but just briefly. Look in the September 2012 entries in Blog Archive to the right.
      Cheers, Lennart

      Delete